You have dreamed of the moment you can step inside your remodeled shower. Greek mosaics line the walls, and a cascading waterfall flows from your new showerhead.
Before you get too excited about your new installation, it’s important to understand the practicalities involved. At Benjamin Franklin Plumbing, we can typically complete a new shower installation in one to five days.
However, customized or remodeled showers may take several days longer. If you need any tile work, plumbing updates, or waterproofing, the project will take longer.
Quick Takeaways
- A shower installation will take between one and five days.
- However, a basic replacement can take as little as one to two days.
- On average, most installations can be wrapped up in around two to three days.
- If you get a custom tile shower, the installation can last more than five days.
- Any plumbing changes and waterproofing can increase how long the installation takes.
- Getting a professional installation is essential for avoiding delays and expensive mistakes.
Average Shower Installation Timeline by Project Type
To get a better understanding of how long your installation will take, we’ve compiled some of the most common project types.
Basic Shower Replacement: 1 to 2 Days
Basic replacements involve switching out an existing unit for a similar unit. Because both units are essentially the same size and style, minimal plumbing changes are involved.
Standard Shower Installation: 2 to 3 Days
This type of shower installation necessitates a few minor plumbing adjustments. You may need a new enclosure or new fixtures.
Custom or Full Remodel Shower: 4 or More Days
With a full remodel, you may need waterproofing, tile work, or layout updates. Because the installation is more complex, it takes longer.
Step-by-Step Shower Installation Timeline
When our team comes out for a shower installation, we will work on the following steps.
Day 1: Removal of the Old Shower and Prep Work
We’ll start by removing the old shower and getting down to the studs. Then, our plumbers will verify whether any repairs are needed. For example, we may need to fix moisture damage or repair the subfloor.
Day 2: Plumbing Adjustments
We will handle the rough-in plumbing, such as the valve installation and P-trap.
Day 3: Installation of the Shower Base or Walls
The wall surround, wall backing, and shower pan must be installed.
Day 4: Tile Work, Sealing, and Waterproofing
If you need tile work, sealing, and waterproofing, we’ll handle it after the shower base and walls are installed.
Day 5: Fixture Installation and Finishing Touches
Finally, we will install the showerhead, faucet trim kit, shower door, and handle.
What Affects How Long It Takes To Install a Shower?
While each project is different, there are a few factors that determine how long an installation takes.
- Plumbing complexity
- Shower type
- Curing and drying requirements
- The condition of existing plumbing systems and the subfloor
- Permit and inspection requirements
- Material availability
What Can Delay a Shower Installation?
Until we begin the project, we might not be able to tell if there are any framing problems or hidden water damage. If any of the following issues occur during your installation process, it can extend your project’s timeline.
- Water damage or mold
- Framing and structural problems
- Outdated plumbing that must be replaced
- Shipping delays for specialty materials
- Improper waterproofing
How To Speed Up a Shower Installation
If you are concerned about how long the project will take, there are a few things you can do to speed up the process. Keeping your plumbing layout the same and choosing prefabricated systems will drastically shorten the timeline. Additionally, you should pre-select materials and order them before the project begins.
Why Professional Shower Installation Matters
Getting a professional shower installation is essential. Our team will make sure your project meets local plumbing codes. Because of our high-quality craftsmanship, we can ensure proper drainage and slope. Over the long run, you’ll experience fewer leaks and water damage when you work with a professional.
FAQs
Can a shower be installed in one day?
It is technically possible to install a shower in just one day, but this heavily depends on how much prep work was done in advance and the materials involved. As a general rule, it’s better to plan on the project taking longer.
How long does it take to replace a shower with tile?
If we need to add tiles, it can take up to two weeks. In most cases, these projects last about five to seven days. Our plumbers will also talk to you about how long we expect the project to take, so this won’t be a surprise.
Do plumbing changes increase installation time?
Absolutely. Any added work will increase the installation time. It all depends on the extent of the plumbing changes.
How long should you wait to use a new shower after installation?
Once we’ve installed your shower, you should wait at least 24 hours to use it. This allows the plumber’s putty and sealant to cure completely before they are exposed to water.
What is the fastest type of shower to install?
Prefabricated acrylic and fiberglass kits are the fastest option.
Does waterproofing add extra time to installation?
Yes, it does. When waterproofing is involved, the project will require an extra 24 to 72 hours to allow for curing.
Need Shower Installation in Tampa, FL?
At Benjamin Franklin Plumbing, our punctual plumbers can handle all of your installation and repair needs. From installing a shower to diagnosing hidden leaks, we can ensure your plumbing systems are functioning at their best.
For more information, schedule a consultation with our licensed plumbers today.